You're in preview mode.
Back to homepage
Live Preview

This is your dashboard

Branded with your logo. Filled with your documents.

127
Documents
8
Active Projects
34
Site Audits
98%
Approved

Recent documents

Sample data
Roof replacement — 12 Acacia Avenue
Method Statement · Roofing · Today
Electrical rewire — Ground floor
Risk Assessment · Electrical · Yesterday
Weekly walk — Site B
Site Audit · General · 2 days ago

A peek inside each tool

Snippets of the kind of output you'll be creating.

Method Statement
Roof replacement
Sequence of work
  • Erect scaffolding to BS EN 12811
  • Remove existing tiles and felt
  • Install new breathable membrane
  • Re-tile and ridge using mechanical fixings
Risk Assessment
Electrical rewire
Hazard
Initial
After controls
Working at height
20
10 Medium
Falling objects
12
4 Low
Manual handling
12
6 Low
Site Audit
Weekly walk · Site B
80%
Score
PPE in use by all operatives
Scaffolding inspected this week
First aid kit accessible
Fire extinguisher present
Site sign-in board updated
Branded output

Every document leaves looking like yours.

Your logo, your colours, your company details on every page. Clean, consistent and ready to send to your client or main contractor.

Branded PDF

RISK ASSESSMENT

Electrical Rewire — Industrial Park, Manchester
UK HSE COMPLIANT
HASAWA 1974 · MHSWR 1999
Management of H&S at Work
Company / Organisation
Your Company Ltd
Site / Location
Industrial Park, Manchester
Assessment Date
20 May 2026
Review Date
20 Nov 2026
Assessor
J. Smith
Trade / Category
Electrical
RISK RATING MATRIX
Low (1–4)
Monitor
Medium (5–9)
Plan action
High (10–15)
Priority action
Extreme (16–25)
Immediate action
LIKELIHOOD: 1 Rare · 2 Unlikely · 3 Possible · 4 Likely · 5 Almost Certain
SEVERITY: 1 Negligible · 2 Minor · 3 Moderate · 4 Major · 5 Catastrophic
RISK ASSESSMENT REGISTER
#
Activity
Hazard
Who
Initial
Controls
Residual
Action
1
Wiring installations
Electric shock from live wires
Electricians
4 × 5 = 20
Extreme
1. Isolate circuits & lock off
2. Test before touch with approved tester
3. Use insulated tools rated to 1000V
2 × 4 = 8
Medium
Site Foreman
30/05/26
2
Working at height
Falls from ladders or scaffolding
All operatives
3 × 5 = 15
High
1. Use Class 1 ladders, footed & tied
2. Harness & lanyard above 2m
3. Daily scaffold inspection
2 × 4 = 8
Medium
Site Foreman
30/05/26
3
Cable installation
Manual handling injuries
Electricians
3 × 4 = 12
High
1. Two-person lift for cable drums
2. Mechanical aids where possible
3. Manual handling training (current)
2 × 3 = 6
Medium
Supervisor
30/05/26
DECLARATION & SIGNATURE
I confirm this risk assessment has been carried out in accordance with the Management of Health and Safety at Work Regulations 1999 and the Health and Safety at Work Act 1974.
Assessor Name
J. Smith
Signature
Date
20/05/2026
Next Review Date
20/11/2026
Electrical Rewire · Prepared by Your Company LtdPage 1

Unlock document generation

You're seeing a preview. Book a demo to see how Site Safety UK generates your own branded RAMS, audits and risk assessments.

Cookie Consent

We use cookies to improve your experience and analyze site usage. By accepting, you consent to our use of cookies. Learn more