What Is the Difference Between a Risk Assessment and a Method Statement?

Confused about when you need a risk assessment versus a method statement — or both? This plain-English guide explains the difference and when each document is required.

What Is the Difference Between a Risk Assessment and a Method Statement?

The Short Answer

  • A Risk Assessment identifies what could go wrong and the likelihood of harm
  • A Method Statement describes step-by-step how the work will be done safely

They're often combined into a single RAMS document, but they serve different purposes.

What Goes in a Risk Assessment?

A risk assessment must cover:

  1. Hazard identification — what could cause harm?
  2. Who is at risk — employees, subcontractors, members of the public?
  3. Current controls — what's already in place?
  4. Residual risk rating — how likely and severe is remaining risk?
  5. Further actions — what else needs to be done?

The HSE's five steps to risk assessment are a useful framework for any trade.

What Goes in a Method Statement?

A method statement is a safe system of work. It should include:

  • A description of the task
  • The sequence of operations
  • Plant, equipment and materials required
  • PPE requirements
  • Emergency procedures
  • Responsible persons

When Do You Need Both?

| Situation | Risk Assessment | Method Statement | |---|---|---| | Small, low-risk maintenance | ✅ | Optional | | Working at height | ✅ | ✅ Recommended | | CDM notifiable project | ✅ | ✅ Required | | Demolition work | ✅ | ✅ Required | | Working near live services | ✅ | ✅ Required |

Common Mistakes to Avoid

  • Copying a generic template without tailoring it to the specific job
  • Not reviewing the RAMS when site conditions change
  • Forgetting to sign off — all operatives should read and sign the method statement
  • No date or version control on the document

Site Safety UK generates trade-specific, job-specific RAMS in minutes. Try it free.

Related articles

Need help with your safety documentation?

Site Safety UK helps contractors create professional RAMS, risk assessments and more in minutes.

Cookie Consent

We use cookies to improve your experience and analyze site usage. By accepting, you consent to our use of cookies. Learn more